Despite our lean resources…

12

Please identify any of these projects from your area of Abia state and confirm it was done by the Ikpeazu administration as part of “carrying along” your
People.
In the area of infrastructure development and renewal, caterpillars and other construction equipment have been active across our state.
A. The Ultra modern Abia Investment House was constructed and commissioned by then Acting President Yemi Osibanjo..
B. Okon Aku bridge at Ohafia local government was delivered and is currently in use.
C. Nneato Bridge leading to Eziama Umunneochi was also commissioned and put to use.
D. Street lighting projects were executed along selected roads at Aba and Umuahia.
E. In Abia State today, over 60 road projects are ongoing with 26 others already delivered and cmmissioned for use by our people.
Some of the roads we have worked on in the past 2 years include:
1. Omeni road – Aba (completed)
2. Adventist close off Ahiaba umeze road -Aba (Completed)
3. Kamalu street- Aba (completed)
4. Umuocham road- Aba (Completed)
5. Umuehilegbu road (erroneously called tonimas) – Aba (Completed)
6. Umule road – Aba (Completed)
7. Owerri road off okigwe road- Aba (Completed)
8. Ochefu street off Azikiwe road – Aba (Completed)
9. Weeks street off ochefu – Aba (Completed)
10. Owerrinta street off ochefu -Aba (Completed)
11. Ukaegbu road -Aba (Completed)
12. Umuola road- Aba (Completed)
13. Ehere road -Aba (Completed)
14. Umuobiakwa ring road obingwa – Obingwa (Completed)
15. Egbelu mbutu/owerenta road- isialangwa south (Completed)
16. Chima Nwafo Road- Aba (Completed)
17. Afara by-pass- Umuahia (Phase 1 Completed)
18. Okonu-Ohafia bridge- Ohafia (Completed)
19. Imo Ndinkpa Bridge – umunneochi (Completed)
20. Road 2, Housing estate – Umuahia (Completed)
21. Abiriba Ring Road phase 1 – Ohafia (Phase 1 completed)
22. Akoli Imenyi Erosion control – Bende (completed)
23: ongoing Faulks road to Brass street
24. Ongoing Ovom street Ogbor Hill Aba
25. Ongoing Emelogu street Aba
26. Ongoing Aba road Umuahia
27. Dozie way Umuahia (Suspended due to low quality work)
28. International conference center road Umuahia. (Completed)
29. Ongoing Dualization of Ururuka Road, Aba
30. Arochukwu road with bridge-Ongoing
31. Ongoing Abiriba-Nkporo road
32. Ongoing Ndioji/Ndi okereke road of 33km
33. Ongoing Idima-Abam road of 10km
34. Ongoing Nkpa road
35. Ibadan Street off Ngwa road (completed)
36. Agharandu street off Ngwa road (Completed)
37. Emejiaka street off Ngwa road (Completed)
38. Onyebuchi Street off Ngwa road (Completed)
39. Ongoing Umuatako road Umungasi Aba
40. Ongoing St Paul’s street Umungasi Aba
41. Ongoing Nwaigwe street Umungasi
42. Ongoing Amechi street Umungasi Aba
43. Ongoing Umuocheala Abayi Ihie road in Isiala Ngwa south LGA
44. Ongoing Umuaro-Ntigha Ekwereazu-Akwa Ibom road
45. Ongoing Umunkpei-Amaiyi-Umuru road
46. Umunka-Ugwunagbo Road (Ongoing)
47. ISIAHIA UMUODE ROAD (ongoing)
Some of the roads we re-asphalted in the past two years include:
1. Georges street – Aba
2. Pound road – Aba
3. Park road – Aba
4. East road – Aba
5. St Micheal- Aba
6. Jubilee Road – Aba
7. Hospital Road- Aba
8. Ube street – Aba
9. Adazi street – Aba
10. Umuwaya street – Umuahia
11. Abam street – Umuahia
12. Kaduna street – Umuahia
13. Awolowo street- Umuahia
14. Uwalaka Link Road- Umuahia
15. Ubakala Street – Umuahia
16. Warri by Club Road – Umuahia
18. Niger Street-Umuahia
19. Mosque street Aba
20. Kent street Aba
21. World Bank road off Orpet
G. Our administration introduced the use of Rigid Pavement (Cement) Technology in road construction to guarantee minimum of 30 years life span for concerned roads. Most of the roads we constructed at Aba were done using this technology following our realization, through painstaking research, that to ensure longevity of new roads at Aba we need to ensure that all our roads are solid with double drains that empties into free flowing major drainage facilities that terminates at our already partially dredged storm water collection points.
H. We embarked on massive desilting of drainage-ways (gutters) at Aba and partially dredged waterside river to receive more storm water and prevent flooding of our roads after the usual heavy rainfall we experience for more than 8 months of the year.
I. It is on record that our administration commenced the construction of the first ever Abia interchange (flyover) since the creation of the state, at Osisioma Aba.
J. Recently, our administration awarded new contracts for the reconstruction of PH, Ngwa road, Osusu, Omuma and Uratta roads with preliminary works concluded. The new PH road is expected to be a 6 lane road with dedicated BRT lane and actual earth moving work is expected to commence this October at the roads.
K. Our administration is actively working on federal government owned Aba-Owerri road Aba with drainage and other works currently ongoing at portions of the road.
L. We have completed 2 massive erosion control works at Imenyi Bende and Abiriba roundabout. Another erosion control work is ongoing at Umuda Isingwu in Umuahia north local government.
As part of our efforts to reactivate moribund factories in the state, we resuscitated the Aba Glass industry. Currently, we are clearing up issues of ownership and gas supply to the facility.
To support our MSMEs with steady power supply, we are actively working with the federal government to provide steady power supply at Ariaria International market area of Aba. Our administration is also supporting Geometrics to commence operations and provide uninterrupted power supply to Aba.
The initial works for the emergence of Umukalika leather and garment cluster is ongoing and we hope to move into the location early next year.
……..continues

Comments are closed.